article · Energies
Despite the unstoppable global drive towards electric mobility, the electrification of sub-Saharan Africa’s ubiquitous informal multi-passenger minibus taxis raises substantial concerns. This is due to a constrained electricity system, both in terms of generation capacity and distribution networks. Without careful planning and mitigation, the additional load of charging hundreds of thousands of electric minibus taxis during peak demand times could prove catastrophic. This paper assesses the impact of charging 202 of these taxis in Johannesburg, South Africa. The potential of using external stationary battery storage and solar PV generation is assessed to reduce both peak grid demand and total energy drawn from the grid. With the addition of stationary battery storage of an equivalent of 60 kWh/taxi and a solar plant of an equivalent of 9.45 kWpk/taxi, the grid load impact is reduced by 66%, from 12 kW/taxi to 4 kW/taxi, and the daily grid energy by 58% from 87 kWh/taxi to 47 kWh/taxi. The country’s dependence on coal to generate electricity, including the solar PV supply, also reduces greenhouse gas emissions by 58%.
This page summarises published work. The authoritative version sits with the publisher.
DOI: 10.3390/en17020457
Is something wrong with this record? Report it or request removal.
Discussion
Have you built on this work, tried to replicate it, or seen it applied in practice? Share what you know. Verified researchers and MARATTO™ domain experts can open a discussion, and any member can reply. Contributions are reviewed before they appear.
No discussion yet. Open the first thread.
New to MARATTO™? Create a free account.