article · International Review of Electrical Engineering (IREE)
This paper presents a study of the impact of connecting two-phase loads on High Voltage (HV) transmission networks. The case study chosen for this purpose is the connection of the substation supplying the High-Speed Rail (HSR). The power supply of this type of train is ensured by a two-phase system, which can affect the quality of the electrical energy by the appearance of disturbances, such as harmonics, unbalances, and flickers. Two 225-kV lines supply the HSR of Morocco. In this paper, the power quality recordings of SICAM Q80 installed in one of the substations supplying the Moroccan HSR are exposed and analyzed. The objective of this article is to study and understand the connection mode of two-phase loads and their impact on the transmission network in terms of power quality, as well as the disturbances due to the power supply network and those generated by the railway installation.
This page summarises published work. The authoritative version sits with the publisher.
DOI: 10.15866/iree.v18i4.22085
Is something wrong with this record? Report it or request removal.
Discussion
Have you built on this work, tried to replicate it, or seen it applied in practice? Share what you know. Verified researchers and MARATTO™ domain experts can open a discussion, and any member can reply. Contributions are reviewed before they appear.
No discussion yet. Open the first thread.
New to MARATTO™? Create a free account.