MARATTO

article

Stochastic Energy Management Framework for Multi-Microgrid with Demand Response and Battery Storage

Abstract

this paper proposes a techno-economic assessment of the integration of the Demand Response Program (DRP) and Battery Energy storage system (BESS) in Multi-Microgrid (MMG) energy management (EM). Additionally, to consider the uncertainties in MMG resources, the Point estimation method (PEM) with Quantum Artificial Rabbits Optimization (QARO) technique is developed to estimate the probability density function (PDF) of operating cost and Independence Performance Index (IPI). A day-ahead EM problem is modeled for operating and transaction cost minimization while the MMG benefit is maximized. The Proposed QARO is employed to solve the deterministic problem in three case studies. The operating cost is reduced with the integration of DR and the BESS. The integration of DR and BESS enhanced the IPI by 2.4%. In addition, the proposed hybrid QARO-PEM is implemented to solve the stochastic EM problem, and the PDF for operating cost and IPI are estimated.

Research topics

  • Microgrid Control and Optimization
  • Smart Grid Energy Management
  • Advanced Battery Technologies Research

Sustainable Development Goals

Read the original research

This page summarises published work. The authoritative version sits with the publisher.

DOI: 10.1109/acdsa59508.2024.10467676

Is something wrong with this record? Report it or request removal.

Discussion

Discuss this research

Have you built on this work, tried to replicate it, or seen it applied in practice? Share what you know. Verified researchers and MARATTO™ domain experts can open a discussion, and any member can reply. Contributions are reviewed before they appear.

No discussion yet. Open the first thread.