preprint
In this work, comprehensive statistical data characterizing state of the Nigerian Electricity Generation System have been generated. Herein, Data Employment Analysis (DEA) scenario method performance analysis has been conducted on the generated data. The main outcome results showed that the installed and generation capacity increased by 23% and 44.3% for years 2016 and 2020, respectively. Similarly, the outcome of scenario analysis conducted using DEA on the constraints; show that, if the two major constraints can be eliminate i.e. gas and distribution the generation performance can be increases to approximately 99.9%. The market performance improved from 28.12% in 2016 to 40.83% in2020.
This page summarises published work. The authoritative version sits with the publisher.
DOI: 10.14293/pr2199.000475.v1
Is something wrong with this record? Report it or request removal.
Discussion
Have you built on this work, tried to replicate it, or seen it applied in practice? Share what you know. Verified researchers and MARATTO™ domain experts can open a discussion, and any member can reply. Contributions are reviewed before they appear.
No discussion yet. Open the first thread.
New to MARATTO™? Create a free account.