article · Indonesian Journal of Electrical Engineering and Computer Science
<p>Large-scale integration of renewable energy (RE) resources into the electrical grid has increased significantly over the last decade, affecting the network at various nodes even at considerable distances from the common connection point. This paper presents an overvoltage assessment caused by the integration of two wind generators (WGs) into a low voltage distribution grid, which is structured into three zones. Two scenarios are studied, the first one considers the low voltage grid without WGs, representing its natural operating condition. In the second scenario, two WGs are connected in zone 3, inducing voltage rises at different nodes within the same zone, by reaching 7.9%, and affecting nodes located in other zones (Zone 1 and Zone 2). The simulation is performed using MATLAB/Simulink (R2025a), and the results obtained are compared to the standards test feeder IEEE 33-bus network, showing the overvoltage caused by WGs integration at nodes close to the connection point while improving voltage quality at distant nodes.</p>
This page summarises published work. The authoritative version sits with the publisher.
DOI: 10.11591/ijeecs.v41.i3.pp859-872
Is something wrong with this record? Report it or request removal.
Discussion
Have you built on this work, tried to replicate it, or seen it applied in practice? Share what you know. Verified researchers and MARATTO™ domain experts can open a discussion, and any member can reply. Contributions are reviewed before they appear.
No discussion yet. Open the first thread.
New to MARATTO™? Create a free account.