Optimal Sizing and Techno-Economic Analysis of Battery Energy Storage System for Peak Shaving and Voltage Profile Improvement on a Rural Distribution Network

Abstract

Distribution networks are increasingly strained by peak load demands and voltage regulation problems. This paper benchmarks Particle Swarm Optimization, Boda-Boda Optimization, and Adaptive Boda-Boda Optimization Algorithm with Fuzzy Logic (ABBOA-Fuzzy) to size and site Battery Energy Storage System (BESS) as a Non-Wires Alternative for rural 11kV feeder support. Baseline analysis of the feeder indicated a peak load of 99.6%, and a voltage drop to 0.936 p.u. The optimization process demonstrated the superiority of the ABBOA-Fuzzy algorithm, which converged faster. The optimized solution guided the selection of a commercially available 400kW/1200kWh BESS which reduced peak demand by 15.5% and raised the minimum voltage to 0.952 p.u. A 15-year techno-economic analysis using the System Advisor Model, accounting for battery degradation confirmed the economic viability with a Net Present Value of $43,643 and an Internal Rate of Return of 15.54%. The study recommends this framework for utility BESS planning.

Research topics

  • Optimal Power Flow Distribution
  • Microgrid Control and Optimization
  • Smart Grid Energy Management

Sustainable Development Goals

Read the original research

This page summarises published work. The authoritative version sits with the publisher.

DOI: 10.64470/elene.2026.1019

Is something wrong with this record? Report it or request removal.

Discussion

Discuss this research

Have you built on this work, tried to replicate it, or seen it applied in practice? Share what you know. Verified researchers and MARATTO™ domain experts can open a discussion, and any member can reply. Contributions are reviewed before they appear.

No discussion yet. Open the first thread.