MARATTO

article · Cleaner Waste Systems

Investigation of the manufacturing processes of recycled aluminum pots: A lean six sigma approach for sustainable and efficient production

2025Open accessUniversity of Douala

Abstract

This study investigates the artisanal manufacturing process of recycled aluminum pots, employing Lean Six Sigma tools to identify major sources of non-conformity. Conducted in Sub-Saharan Africa, primarily across five representative workshops in Cameroon, the study reveals that melting 1 kg of aluminum waste requires an average of 8640 s significantly exceeding typical industrial benchmarks. Value Stream Mapping (VSM) indicates an average cycle time of 12,731 s for mechanical finishing and 14,713 s for manual finishing, with corresponding Process Cycle Efficiencies of 73 % and 75 %. Molding sand quality deteriorates after 90 reuse cycles, reducing cleanliness to 79.85 % and impairing the surface quality of cast parts. Chemical analysis of 45 samples shows that 66.6 % of productions exceeds the regulatory lead limit of 0.05 %, with concentrations reaching up to 0.152 % in some cases. However, the dimensional characteristics (thicknesses ranging from 3 to 6 mm) and Leeb hardness values (289.25–367.35 HL) align with normative requirements (NF EN 12983 and NF EN 601). Impact Strength (1.2–3.6 J/m²) also falls within acceptable thresholds for industrial cast alloys. Multivariate analysis reveals a significant influence of waste type (η² = 0.564; p = 0.016) and melting treatment (η² = 0.472; p = 0.041) on lead content. Lastly, the process capability regarding health safety is critically low (Cp = 0.20; Cpk = −0.166), indicating a non-compliance rate of 97.7 %, which underscores the urgent need for standardization and stricter regulation of the artisanal aluminum recycling sector. • Lean Six Sigma finds root causes in recycled aluminum pot production. • Disparities among the production methods are clearly identified. • Lead content, impact strength, and hardness of the produced pots are thoroughly evaluated. • The overall process capability is determined.

Research topics

  • Bauxite Residue and Utilization
  • Extraction and Separation Processes
  • Recycling and Waste Management Techniques

Read the original research

This page summarises published work. The authoritative version sits with the publisher.

DOI: 10.1016/j.clwas.2025.100432

Is something wrong with this record? Report it or request removal.

Discussion

Discuss this research

Have you built on this work, tried to replicate it, or seen it applied in practice? Share what you know. Verified researchers and MARATTO™ domain experts can open a discussion, and any member can reply. Contributions are reviewed before they appear.

No discussion yet. Open the first thread.