article · International Transactions in Operational Research
Abstract This paper addresses integrated production planning, multi‐quay berth allocation, and quay crane assignment scheduling problems. First, we formulate the problem as a mixed‐integer linear programming (MILP) by extending the relative position formulation presented in the literature to deal with the integrated problem, aiming to maximize the total revenue while considering the demurrage cost. Second, we propose a hybrid MILP‐adaptative large neighborhood search (MILP‐ALNS) approach that we assess using both real‐life instances and randomly generated instances in addition to reported sets from the literature. The results show that the MILP‐ALNS approach performs better than existing iterative local search procedures reported in the literature. In most cases, our approach outperforms CPLEX in terms of time to reach the best solution known while providing comparable solutions.
This page summarises published work. The authoritative version sits with the publisher.
DOI: 10.1111/itor.70102
Is something wrong with this record? Report it or request removal.
Discussion
Have you built on this work, tried to replicate it, or seen it applied in practice? Share what you know. Verified researchers and MARATTO™ domain experts can open a discussion, and any member can reply. Contributions are reviewed before they appear.
No discussion yet. Open the first thread.
New to MARATTO™? Create a free account.