MARATTO

article

Hydropower Dam-Based Rural Electrification in Ethiopia: The Case of Amerti-Nashe Hydropower Plant, Horo Guduru Wollega Zone

20241 citationOpen accessAddis Ababa University

Abstract

Expanding electricity access and energy in rural areas is a central policy issue in Ethiopia. The hydropower plant is one of the solutions to the shortage of electric energy in remote rural areas. This research deals with Amerti-Nashe dam-induced rural electrification in western Ethiopia. The main objectives of this study were to investigate the rural electrification impact of small dams on local communities in Ethiopia in the case of the Ameri Nashi dams. The study collected primary data from a sample of 316 households that live in the vicinity of the dam. Statistical analyses such as the Chi-square test, paired t-test, and binary logistics model were performed to determine differences in energy distribution, use of energy before and after the dam project, energy adoption status, challenges for households to adopt electric energy, and energy impacts. The result of the research shows that more than half of the population was not provided energy from the nearby Ameri-Nashe and Fincha dams, and instead, the majority of the population of the zone depends on traditional fuel as a source of energy. There was a disparity in the distribution of electric energy among the sample households due to different factors like distance from the grid line, the unaffordable cost of adoption, and grid-based electric energy.

Research topics

  • Hydropower, Displacement, Environmental Impact
  • Transboundary Water Resource Management

Sustainable Development Goals

Read the original research

This page summarises published work. The authoritative version sits with the publisher.

DOI: 10.11648/jeece.20240901.11

Is something wrong with this record? Report it or request removal.

Discussion

Discuss this research

Have you built on this work, tried to replicate it, or seen it applied in practice? Share what you know. Verified researchers and MARATTO™ domain experts can open a discussion, and any member can reply. Contributions are reviewed before they appear.

No discussion yet. Open the first thread.