An integrated continuous improvement model of TPM, TPS and TQM for boosting profitability of manufacturing industries: An innovative model & guideline

201725 citationsOpen accessDebre Berhan University

In plain language

This research presents an integrated continuous improvement model combining Total Productive Maintenance, the Toyota Production System, and Total Quality Management structured around the Plan-Do-Check-Act cycle. It addresses an identified gap in industrial literature, where very few studies integrate all three operational philosophies or provide corresponding guidelines for execution. By analysing the distinctive attributes, shared practices, and existing limitations of each methodology, the study synthesises these concepts into a unified framework. Existing insights regarding the unique and overlapping practices of the three systems are retained. The resulting framework and its implementation guideline are designed to assist manufacturing organisations in sustaining long-term competitiveness and boosting overall profitability.

Key takeaways

  • An integrated model combining Total Productive Maintenance, Toyota Production System, and Total Quality Management was developed using the Plan-Do-Check-Act cycle.
  • A practical implementation guideline was formulated to accompany the integrated operational model.
  • The framework synthesises both the unique and common practices of the three continuous improvement systems to bridge gaps found in existing literature.
  • The integrated system is aimed at enhancing competitiveness and profitability within manufacturing industries.

Why it matters

Manufacturing organisations frequently struggle to coordinate separate maintenance, lean production, and quality management initiatives. By unifying these three complementary approaches into a single continuous improvement cycle, the work provides an aligned framework to help industrial managers streamline operational strategies and enhance bottom-line performance.

Commercialisation angle

The model is aimed at plant managers and operational improvement teams across manufacturing industries. As it was developed entirely from literature analysis rather than empirical field trials, the framework represents early-stage conceptual work. Moving towards practical adoption would require testing and validating the implementation guidelines inside operational factory settings.

AI-generated from the published abstract. Always read the original work before citing.

Abstract

The purpose of this research is to develop an integrated literature based TPM, TPS and TQM model through PDCA cycle, and implementation guideline for the implementation of the model. At this time very few studies are available on this research area, even this research on integrated model of TPM, TPS and TQM practices, and implementation guideline are not corresponding. The methodology to develop the model and the implementation guideline is based on identifying the uniqueness and common practices of TPM, TPS and TQM systems, existing practice of the integration and implementation guideline, identifying the existing gaps on the model and implementation guideline, developing new integrated TPM, TPS and TQM practice model, and implementation guideline. Previous very few studies of uniqueness, common practices and implementation guideline of the three systems are preserved. The findings of this research, an integrated cutting-edge model of TPM, TPS and TQM practices and implementation guidelines are developed. The originality / value of the developed model and implementation guideline enable manufacturing industries continuously to be competitive and profitable.

Research topics

  • Quality and Supply Management
  • Digital Transformation in Industry

Sustainable Development Goals

Read the original research

This page summarises published work. The authoritative version sits with the publisher.

DOI: 10.5267/j.msl.2017.11.002

Is something wrong with this record? Report it or request removal.

Discussion

Discuss this research

Have you built on this work, tried to replicate it, or seen it applied in practice? Share what you know. Verified researchers and MARATTO™ domain experts can open a discussion, and any member can reply. Contributions are reviewed before they appear.

No discussion yet. Open the first thread.