MARATTO

article · European J of Industrial Engineering

A hierarchical approach to schedule the two-machine flow shop problem with flexible periodic synchronized maintenance

Abstract

This paper tackles the makespan minimisation for the well-known two-machine flow shop problem with flexible periodic maintenance activities on both machines. The maintenance starting dates are to be decided along with the job's sequence. We adopt a hierarchical approach in which we first decide the job's sequence and then the maintenance starting dates. We identify a dominance rule and a polynomial case, and construct an enhancement procedure. We develop and test several variants of Tabu search and simulated annealing metaheuristics. We also propose an adaptation of the well-known NEH heuristic. The experimental study shows the superiority of one of the variants of simulated annealing and the efficiency of the dominance rule. [Received: 15 July 2022; Accepted: 8 May 2023]

Research topics

  • Scheduling and Optimization Algorithms
  • Advanced Manufacturing and Logistics Optimization
  • Assembly Line Balancing Optimization

Read the original research

This page summarises published work. The authoritative version sits with the publisher.

DOI: 10.1504/ejie.2024.10057224

Is something wrong with this record? Report it or request removal.

Discussion

Discuss this research

Have you built on this work, tried to replicate it, or seen it applied in practice? Share what you know. Verified researchers and MARATTO™ domain experts can open a discussion, and any member can reply. Contributions are reviewed before they appear.

No discussion yet. Open the first thread.