article · Engineering Technology & Applied Science Research
This paper introduces an innovative heuristic optimization approach, referred to as Optimization Approach-Single Hoist Cyclic Scheduling Problem (OA-SHCSP), which aims to minimize the cycle time of the Single Hoist Scheduling Problem (SHCSP). The effectiveness of this proposed heuristic is compared with a previously established heuristic, the Earliest Starting Time (EST). The comparison results reveal that the proposed OA-SHCSP heuristic consistently outperforms the EST heuristic in minimizing cycle time, particularly when more than two products are produced simultaneously. Moreover, as the number of part tasks soaked during a cycle increases, OA-SHCSP demonstrates significantly improved computational efficiency over the EST heuristic. The reduction in average cycle time achieved by OA-SHCSP ranges from 28.73% to 60.29%, underscoring its effectiveness and potential for application in high-volume production environments.
This page summarises published work. The authoritative version sits with the publisher.
DOI: 10.48084/etasr.8767
Is something wrong with this record? Report it or request removal.
Discussion
Have you built on this work, tried to replicate it, or seen it applied in practice? Share what you know. Verified researchers and MARATTO™ domain experts can open a discussion, and any member can reply. Contributions are reviewed before they appear.
No discussion yet. Open the first thread.
New to MARATTO™? Create a free account.