article · Open Physics
Abstract Ibn Tofail University of Kenitra, Morocco, is committed to a national policy of control and mobilization of water resources and the adoption of a planning approach and integrated water management. Within this framework, the university, which contains 40,000 students, produces a quantity of wastewater of 200 m 3 per day. After treatment, the water is used for watering the university’s green space. The treatment process chosen is a membrane bioreactor (MBR), which is considered to be energy intensive. Therefore, the production of energy for the station will be made by renewable energy wind and photovoltaic (PV). The dimensioning of the MBR was made by a research department, which estimated that the energy necessary for the station is 1061.76 kW h/day. The aim of this work is to dimension and optimize the platform for the production of energy, using the Matlab program for the wind turbine and the PVsyst program for PV. The results of coupling our plant with an on-grid PV system and wind turbine show that it was able to reach an electrical coverage of about 72% of the wastewater treatment (WWT) plant’s energy needs. Thus, an estimated reduction of electricity of 0.53 euro on each m 3 of water produced by the WWT plant and thus 106.76 euro on the 200 m 3 produced daily by the station.
This page summarises published work. The authoritative version sits with the publisher.
DOI: 10.1515/phys-2023-0158
Is something wrong with this record? Report it or request removal.
Discussion
Have you built on this work, tried to replicate it, or seen it applied in practice? Share what you know. Verified researchers and MARATTO™ domain experts can open a discussion, and any member can reply. Contributions are reviewed before they appear.
No discussion yet. Open the first thread.
New to MARATTO™? Create a free account.